You are using an unsupported browser. Please update your browser to the latest version on or before July 31, 2020.
close
Power Line Connectors
print icon

 

Setting up power line connectors

  • If your modem is not near your TV Set Top Box (STB), you can connect your STB to your modem using the 2 Power Line Connection (PLC) adapters included in your set up kit:
    • To do this, attach one ethernet cable to your STB and then into a PLC adapter. Connect the PLC adapter into a nearby electrical wall outlet. 
    • Attach the second ethernet cable directly into your modem and into second PLC. Connect the PLC into a convenient electrical wall outlet. 

The two PLCs can now establish a connection between your modem and your set-top box.

 

If you have more questions regarding the power line connector set up, click to view a more detailed user manual.

 

Power line connector support 
Power Line Connectors (PLCs) are adapters that allow you to use the electrical wiring in your home to secure a wired connection between your set top box and internet modem when they are not close to one another. 

  • You will need 2 PLCs to connect your primary Set Top box and an additional PLC for each additional set-top box. 
  • Occasionally, you will need to resync your PLCs, especially after a long case of inactivity. For help to do this click here.

Resync your PLCs

  1. Press and hold the security button of PLC A for 10 seconds, release the button.
  2. Press and hold the security button of PLC B for 2 seconds, release the button (power light will flash).
  3. Press and hold the security button of PLC A for 2 seconds, release the button (power light will flash).
  4. After a few seconds, the DATA light will light up on both PLCs.

Add/sync a third PLC

  1. Press and hold the security button of the additional PLC for 10 seconds, release the button. The light will not flash.
  2. Then press and hold the security button of the same for 2 seconds, release the button. This time the power light will flash.
  3. Then press and hold the security button on one of the two original PLCs for 2 second. The power light will flash again.
  4. After a few seconds, the new PLC DATA light will be solid.

 

 

Feedback
0 out of 0 found this helpful

Attachments

Plc60_1.pdf
scroll to top icon